4虎影院在线观看_手机免费av_4虎comwww最新免费地址_日漫黄色_欧美精品一级二级_亚洲成人福利

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

主站蜘蛛池模板: 日本一区二区三区视频中文字幕 | 不卡成人| av在线天堂亚洲 | 成人欧美在线视频 | 国产亚洲精品久久久999密壂 | 亚洲国产精品成人天堂 | 日韩在线中文字幕视频 | 御姐av在线 | 国产精品无码dvd在线观看 | 日韩人妻无码喷潮中出 | 又黄又爽又刺激的视频 | 夜夜调教禁脔欢爱h | 婷婷丁香六月激情综合在线人 | 91叼嘿 | 欧美一区二区三区a | 中文理论片| 国产AⅤ爽AV久久久久玉浦团 | 色国产精品一区在线观看 | 国产高清免费在线播放 | 好爽快点深一点好大 | 高中生高潮抽搐喷出白浆视频 | 国产在线精品一区二区 | 国内精品免费一区二区2001 | 好男人神马影院 | 亚洲毛片在线视频 | 欧美国产日韩在线 | 女人与牲口性恔配视频免费 | 亚洲第一综合 | 69精品无码一区二区 | 99re免费视频 | 中文字幕无码AV激情不卡 | 免费看日产一区二区三区 | 麻豆视频在线免费看 | 久久99久久99精品免视看看 | 91精品国产综合久久久久久首页 | 国内精品免费一区二区2001 | 久久爱黑人激情av | 黄色小说av | 国产九九九精品视频 | 我要看黄色大片 | 亚洲av无码免费成人av |