4虎影院在线观看_手机免费av_4虎comwww最新免费地址_日漫黄色_欧美精品一级二级_亚洲成人福利

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

主站蜘蛛池模板: 中文字幕无码AV激情不卡 | 在线黄色观看 | 国产免费久久精品99RE丫丫 | 一级片国产 | 色一情一乱一伦一区二区三区 | av在线超碰 | 在线观看中文字幕dvd播放 | 欧美日韩国产限制 | 亚洲三级中文字幕在线看 | 久久久天堂国产精品 | 中日韩亚洲人成无码网站 | 成人av视频在线观看 | 日韩亚洲视频 | 日韩精品人妻系列无码AV东京 | 日日干夜夜爽 | 99精品国产再热久久无毒不卡 | 久久久www免费人成精品 | 国产精品久久久爽爽爽麻豆色哟哟 | 91伦理片在线观看 | 韩日免费 | 久久精品无码专区免费东京热 | 亚洲中文无码成人手机版 | chinese45丰满成熟hd | 18禁黄久久久AAA片 | www480jcom四虎| 国产欧美视频一区二区三区 | 国产成人精品无码一区二区 | 亚洲hh| 日日摸夜夜添夜夜无码区 | 91蜜臀精品国产自偷在线 | 狂野欧美激情性XXXX按摩 | 国内精品久久久久影院优 | 996热re视频精品视频这里 | 欧美人成精品网站播放 | 国产不卡一二三区 | 欧美视频a | 爆乳3把你榨干哦ova在线观看 | av黄色小说 | 亚洲综合图片区色 | 亚洲精品乱码久久久久膏 | 50丰满少妇高潮惨叫正在播放 |