4虎影院在线观看_手机免费av_4虎comwww最新免费地址_日漫黄色_欧美精品一级二级_亚洲成人福利

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

主站蜘蛛池模板: 国产99久9在线视频 日本无人区码suv | 亚洲AV最新在线观看网址 | 欧美综合一区二区 | 久久久久久久久久久久久久久国产 | 欧美成人精品A∨在线观看 成人毛片视频在线观看 | 国产亚洲综合精品 | 免费精品国产福利片 | 色欲av久久无码影院色戒 | 美国bbbbbbbbb免费毛片 | 99精品国产在热久久无毒不卡 | 免费无码又爽又刺激高潮视频 | 免费黄色网址在线观看 | 99久久精品自慰喷水 | 永久免费看啪啪网址入口 | 国产高清精品在线观看 | 一区二区三区在线免费 | 久综合在线 | 无码国内精品人妻少妇蜜桃视频 | 伊人免费视频 | 精品欧美一区二区精品久久 | 无码男男肉片在线观看 | 日韩一区免费视频 | 91嫩草欧美久久久九九九 | 男人猛躁女人免视频 | 视频自拍一区 | 色很久综合 | 亚洲性图av| 免费碰碰视频在线观看 | 亚洲中文有码字幕日本第一页 | 中文字幕天天干 | 一区二区最新免费视频 | 日本高清一二区 | 成人在线观看亚洲 | 久产久精九国品在线 | 亚洲ΑV无码一区二区三区四区 | 国产精品专区第一区 | 9久9久精品视频在线观看 | AV淘宝国产在线观看 | 日本精品一区二区三区四区 | 黄色毛片免费看 | 视频一区视频二区视频三区视频四区国产 |