Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

主站蜘蛛池模板: aa视频免费看 | 四虎四虎| 四虎新影院2019址 | 久草www| 欧美视频a | 最近免费中文字幕中文高清 | 伊人久久一区二区三区无码 | 一区二区不卡在线播放 | 日本一区二区国产 | 99热婷婷| 国产精品久久久久久久久吹潮 | 国产欧美日韩在线观看一区二区 | 天天干夜夜看 | 国产成人精品视频免费 | 日韩福利二区 | 91精品在线免费视频 | 青娱乐99| 无码人妻精品1国产婷婷 | 中文字幕69av| 国产高清成人av片 | 精品无码一区二区三区在线 | 日韩免费成人 | 成人亚洲在线 | 96超碰在线| 亚洲AV最新在线观看网址 | 国产精品久久久久久久毛片动漫 | 亚洲另类色区欧美日韩图片 | 国产色爽女 | 国产福利影院 | 日本精品中文字幕在线不卡 | 国产AV永久无码精品网站 | 中文字幕无码日本欧美大片 | 无码专区—VA亚洲V天堂 | 九九热久久免费视频 | 狠狠综合久久久久综合 | 国产极品女主播国产区 | 久久婷婷五月综合成人D啪 成人av视频在线观看 | 国产中老年妇女精品 | 操的很爽 | 亚洲欧美一区二区在线观看 | 亚洲手机在线播放 |